Pinkerton Academy Turf Football Field

PROJECT NAME:
Pinkerton Academy Football Field Turf Replacement
PROJECT LOCATION:
Derry, NH
PROJECT OWNER:
Pinkerton Academy
GENERAL CONTRACTOR:
American Excavating Corp.
PROJECT VALUE:
$300,000
SCOPE OF WORK:
AEC was contracted to prepare the existing Pinkerton Academy football field for a new synthetic turf surface. AEC worked with the school to prepare the field, including upgrading the existing infrastructure to handle the new synthetic surface. A critical aspect of this project was that an attached surrounding running track was not to be damaged or disturbed – a task AEC accomplished through careful and diligent work and planning.